Improvement To Geylang River Between Geylang Road and Paya Lebar Way

  • Image 01
  • Image 01
  • Image 01
  • Image 01
  • Improvement To Geylang River Between Geylang Road and Paya Lebar Way
  • Minor Sewer and Plumbing Work

General Description

  • The project involves construction of U-drain and box culverts between Geylang Road and Paya Lebar Way.

Technical Information

  • The project requires the construction of approximately 193m length of 18m wide by 3m deep U-drain with cantilever footpath on both sides and construction of approximately 143m length of 18m to 22m wide by 3m to 3.2m deep transition box-culvert with pile foundations, including demolition of the existing 12m wide U-drain. The diversion of approximately 45m length of 700mm diameter water main, construction of water control gate, and traffic diversions along Eunos Avenue 5 and Sims Avenue is necessary to facilitate the drainage improvement works.