Aircraft Bridge at Seletar

  • Image 01
  • Aircraft Bridge at Seletar

General Description

  • Design and construction of the aircraft bridge at Seletar Airport across the Public Utilities Board’s (PUB) water channel to extend the Runway End Safety Area (RESA) from Seletar Airport’s airside to Pulau Punggol Barat.

Technical Information

  • The project involves building a 48m long, 150m wide aircraft bridge across PUB’s water channel. Construction works were within the flight path and in close proximity to the runway, therefore tall machinery and plants could be used only when the runway was closed. Adding to the challenge was the extremely tight schedule of 13 months from start to completion.