10 Shelford
General Description
- Construction of a five-storey residential development (69 units) complete with attics, mechanized carparks at basement, a swimming pool as well as gymnasium.
Technical Information
- Eng Lee Engineering, as the main contractor, is responsible for the entire project which comprises 69 units of residential apartment with mechanized carparks at basement, a swimming pool and a gymnasium. As the project site is located in an existing residential area, the challenge is to carry out the construction with minimum noise, dust and vibration.